Apartment and office moves +38 (097) 556-48-53 Telegram Viber
IT moving Kyiv

Relocation of a server room in Kyiv with control over racks, UPS and network equipment

pereizd.kyiv.ua helps to organize the physical part of moving the server and IT area: racks, UPS, network equipment, office equipment, cables and a delicate move to the new premises.

Racks and UPSNetwork equipmentMarking and control

Server racks

We plan the route and physical carrying items indoors according to the size, weight and availability of technical areas, elevators and corridors.

Peripherals and office equipment

Monitors, system units, MFPs, network devices, and ancillary equipment must be labeled and packaged separately.

Starting a new point

We arrange unloading so that critical equipment does not get lost among furniture, archives and office boxes.

What you need to start

  • list of racks, UPS and large equipment
  • photo of server or technical room
  • description of access to elevators, parking and corridors
  • designation of critical devices for priority carrying items indoors

Next step

If there is a photo of the server room and a basic list of equipment, this is enough to assess the physical scenario of the move without lengthy clarifications.

Server room relocation scenarios

IT equipment is better managed as a separate critical area, not as part of the furniture

Racks, UPS, network equipment, cables and peripherals need marking, controlled packaging and a clear sequence of moving to a new location.

Racks

Cabinets, UPS, heavy equipment

We separately evaluate the weight, dimensions, elevators, corridors, doorways and access to the technical room.

Add shippers
Marking

Cables, boxes, peripherals

Peripherals, monitors, MFPs, network devices, and accessories must be shipped in separate labeled groups.

Add packaging
Office

Server room inside B2B-relocation

If workplaces, archive and furniture go together, the server room should be separated into a separate work route.

Office moving
Do you replace the IT team when moving the server room?

No. We close physical logistics: packaging, labeling, take-out, transportation and loading of equipment. Technical shutdown and startup is usually left to the customer's IT team.

What is needed to calculate the relocation of the server room?

We need a list of racks, UPS, network equipment, a photo of the technical room, information about elevators, parking, corridors and the desired work window.

Is it possible to combine a server room with an office move?

Yes, if workplaces, furniture, archives or office equipment are moved together, it is better to count the server room as a separate critical area inside office relocation.