What to do before loading
Before transportation, the boiler must be disconnected and the water drained. Fasteners, nozzles and small parts should be folded separately, and the body should be protected from impacts during removal.
What to tell the carrier
- boiler volume in liters;
- is the water drained;
- whether the tank has already been dismantled;
- floor, elevator and bathroom width;
Why is this a separate challenge and not just another box
A boiler seems like a simple object, but even a small amount of water adds considerable weight, and the pipes and fittings are easily damaged. That is why such work better connects with the service boiler transportation, not with a random loading without a plan.
When the cargo taxi is enough
If you need to move one item without a full move, it is often enough cargo taxi with the required number of porters. If furniture, boxes or other equipment are traveling together, it is better to immediately calculate the scenario through transportation of equipment.